A lightweight EWI solution for a live city-centre hotel refurbishment
Travelodge Birmingham Moor Street, Birmingham
Brand: Caparol UK
Location: Birmingham
System: Capatect Ecomin 400
Project overview
Delivered in partnership with TSL, the refurbishment of Travelodge Birmingham Moor Street formed part of the hotel operator’s wider modernisation programme.
The project centred on replacing the building’s ageing façade with a modern External Wall Insulation (EWI) system capable of improving thermal performance while maintaining the hotel’s established appearance.
With the hotel remaining fully operational throughout the works, the solution also needed to minimise disruption within a constrained city-centre environment.
Key outcomes
- Improved thermal performance and energy efficiency
- Enhanced fire safety and regulatory compliance
- Durable, low-maintenance facade solution
- Refreshed exterior aligned with Travelodge brand standards
- Reduced logistical impact through lightweight system design
- Successful delivery within a live hotel environment
The challenge
The existing facade system had deteriorated over time, reducing the building’s thermal efficiency and leaving it reliant on outdated construction materials.
Located in a busy area of central Birmingham, the site presented a number of logistical challenges, including restricted access, limited storage space and consistently high pedestrian footfall. In addition, all works needed to be carried out within a live hotel environment without affecting day-to-day operations or guest experience.
The project therefore required a refurbishment solution that combined improved thermal performance, enhanced compliance and efficient installation.
The solution
To meet the project requirements, Caparol UK, specified the Capatect Ecomin 400 External Wall Insulation system incorporating lightweight Meldorfer brick slips.
Designed to replicate the appearance of traditional brickwork, the system enabled the hotel façade to retain its existing aesthetic while significantly improving the building’s thermal performance.
The lightweight nature of the Meldorfer slips also provided major logistical advantages compared with traditional masonry systems. Requiring substantially fewer deliveries to site, the solution reduced transport demands, eased handling and minimised on-site storage requirements within the constrained urban location.
A broad range of finishes and colours also enabled the project team to achieve a like-for-like façade appearance aligned with the Travelodge brand.
Installation and delivery
Given the operational nature of the site, the refurbishment was delivered through a carefully phased installation programme coordinated around hotel operations and surrounding public activity.
Close collaboration between Caparol, TSL and project stakeholders ensured deliveries, access arrangements and installation schedules were managed efficiently throughout the programme.
The use of lightweight Meldorfer brick slips proved particularly valuable during delivery. Compared with traditional brick systems, the reduced material weight and faster installation process helped streamline logistics and maintain programme efficiency across the live city-centre site.
Regular site inspections and ongoing communication between project teams also enabled issues to be identified and resolved quickly, helping keep the refurbishment on schedule.
The result
The completed project has delivered a modernised and thermally improved facade that enhances both the performance and long-term durability of the building.
By combining early-stage collaboration with a carefully managed installation strategy, the refurbishment was completed successfully while the hotel remained fully operational throughout.
The project also demonstrated the practical benefits of lightweight EWI systems for occupied urban refurbishments, particularly where access, logistics and programme efficiency are key considerations.
Comment from Caparol UK
“Early engagement played an important role in the success of this project. It allowed the team to develop the right installation strategy from the outset, balancing programme efficiency with the practical challenges of a busy city-centre location and an occupied hotel environment. Through close collaboration across the project team, the refurbishment was delivered with minimal disruption to hotel operations.”
Jim Holman, Business Development Manager